Aerial view of paving operations

Macomb Work Zone

Macomb County’s home for road and bridge construction and traffic project information. To help all road users navigate construction work in Macomb County, the Macomb Work Zone includes information and resources to keep the public informed and up to date of what's happening on the roadways.

To ensure safe, efficient, and reliable travel for motorists that use the more than 1,700 miles of roads and 226 bridges under the jurisdiction of Macomb County, MDCR is committed to improving our transportation infrastructure by delivering quality road, bridge, and traffic projects.

Between state, county, and local projects, there are hundreds of work zones in Macomb County each year. To help all road users navigate construction work in Macomb County, the Macomb Work Zone includes information and resources to keep the public informed and up to date of what's happening on the roadways.

Sign up to receive real-time lane closure information and construction updates from the Department of Roads.

Work zone safety

Road Work Ahead sign in front of a orange Macomb County Department of Roads tandem truck

MCDR works closely with local contractors and engineers to build some of the safest and most efficient roads in Michigan. To help keep the roads, workers, and drivers safe, MCDR strongly encourages drivers to practice these driving tips:

  • Plan ahead. Expect delays, plan for them, and leave early to reach your destination on time. When you can, avoid work zones altogether by using alternate routes.
  • Obey road crews and signs. When approaching a work zone, watch for cones, barrels, signs, large vehicles, or workers in bright-colored vests to warn you and direct you where to go.
  • Slow down. Look for signs indicating the speed limit through the work zone. Keep a safe distance from the vehicle ahead of you and follow the posted speed limit.
  • Move over. Most state move-over laws apply when passing work crews and official vehicles parked on the shoulder with flashing warning lights.
  • Avoid distractions. Keep your eyes on the road and off your phone at all times.
  • Watch for sudden stoppages. Don’t make sudden lane changes in front of trucks that are trying to slow down.

Active projects

Below is a list of active projects on Macomb County roads.

11 Mile Road in Warren
Location: East of Dequindre Road
Traffic: A double lane closure is in place on northbound Dequindre Road between 11 Mile Road and Edward Griggs Boulevard. A single lane closure is in place on westbound 11 Mile Road between David Givens Street and Dequindre Road.
Duration: March 2026 – October 2026
Description: Eight miles of natural gas pipeline will be replaced in Oakland and Macomb counties. Work is part of the Consumers Energy Four Cities Metro Pipeline project. Contact 248-433-5780 or fourcitiespipeline@cmsenergy.com for additional information.

14 Mile Road in Clinton Township and Roseville
Location: Between Kelly Road and Gratiot Avenue (M-3)
Traffic: The road is open to traffic. Intermittent lane closures will be in place to perform restoration and punch list work. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: April 2026 – Fall 2026
Description: Restoration and punch list work.

Sugarbush Road in Chesterfield Township
Location: Between Callens Road and Jefferson Avenue
Traffic: Sugarbush Road will be open to northbound traffic only. Drivers are encouraged to follow the posted detours and seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: June 9, 2026 – October 2026
Description: Road rehabilitation.

Jefferson Avenue in Harrison Township
Location: Between Metropolitan Parkway and South River Road
Traffic: Jefferson Avenue will be open to northbound traffic only. Drivers are encouraged to follow the posted detour and seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: June 22, 2026 – October 2026
Description: Road rehabilitation.

Schoenherr Road bridge over the Red Run Drain in Sterling Heights
Location: Between 15 Mile Road and Moravian Drive
Traffic: Schoenherr Road will be partially open during bridge work with two temporary lanes of traffic. Drivers should expect delays and are encouraged to seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: July 6, 2026 – November 2026
Description: Bridge deck replacement.

Broughton Road in Macomb Township
Location: Between 23-1/2 Mile Road to 24-1/2 Mile Road
Traffic: 24 Mile Road will be closed to through traffic between Romeo Plank Road and Foss Road. Drivers are encouraged to follow the posted detour and seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: July 9, 2026 – November 2026
Description: Road reconstruction.

Bonior Trail in Clinton Township
Location: Between Utica Road and the Clinton River
Traffic: Intermittent closures of sections of the Bonior Trail will be in place during rehabilitation operations.
Duration: August 10, 2026 – Fall 2026
Description: Trail and pedestrian bridge rehabilitation. Work is associated with Bonior Trail pathway improvements by Clinton Township. Contact the Clinton Township Department of Public Services at 586-286-9300 for additional information.

Cotton Road in Chesterfield Township
Location: Between Gratiot Avenue (M-3) and Halo Drive
Traffic: The road will remain open and traffic will be maintained during construction operations. Drivers should expect delays and are encouraged to seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: August 17, 2026 – October 2026
Description: Asphalt preservation and resurfacing. The project is part of MCDR's 2026 Pavement Preservation Program (PPP).

Little Mack Avenue, Carlier Street and South Nunneley Road in Clinton Township
Location: Between Groesbeck Highway and Gratiot Avenue
Traffic: Little Mack Avenue, Carlier Street and South Nunneley Road will be open to local traffic only. Drivers should expect delays and are encouraged to seek alternate routes. Access to all properties will be maintained throughout the duration of the project, but through traffic will be restricted.
Duration: August 17, 2026 – November 2026
Description: Road reconstruction.

14 Mile Road in Fraser
Location: Between Hayes Road and Utica Road
Traffic: The road will remain open with lane closures in place during construction operations. Drivers should expect delays and are encouraged to seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: August 17, 2026 – October 2026
Description: Concrete patching. The project is part of MCDR's 2026 Pavement Preservation Program (PPP).

Rosso Highway in Chesterfield Township and Harrison Township
Location: Between I-94 and Jefferson Avenue
Traffic: The road is open to traffic. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: August 17, 2026  – November 2027
Description: Road relocation and reconstruction.

Clinton River Road in Clinton Township
Location: Between Hayes Road and Garfield Road
Traffic: The road will remain open and traffic will be maintained during construction operations. Drivers should expect delays and are encouraged to seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: August 27, 2026 – October 2026
Description: Asphalt overlay. The project is part of MCDR's 2026 Pavement Preservation Program (PPP).

Clinton River Road in Clinton Township
Location: Between Garfield Road and 17 Mile Road
Traffic: The road will remain open and traffic will be maintained during construction operations. Drivers should expect delays and are encouraged to seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: August 27, 2026 – October 2026
Description: Asphalt overlay. The project is part of MCDR's 2026 Pavement Preservation Program (PPP).

32 Mile Road in Richmond and Richmond Township
Location: Between the CN railroad crossing and the County line
Traffic: The road will be open to one way traffic during construction operations. Drivers are encouraged to follow the posted detours and seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: August 31, 2026 – October 2026
Description: Asphalt preventive maintenance and resurfacing.

10 Mile Road in Warren
Location: Between Lorraine Avenue and Hoover Road
Traffic: The road will remain open with lane closures in place during construction operations. Drivers should expect delays and are encouraged to seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: September 28, 2026 – October 2026
Description: Concrete patching. The project is part of MCDR's 2026 Pavement Preservation Program (PPP).

🚧 Bordman Road in Richmond Township 🚧
Location: Between Cryderman Road and Deland Road
Traffic: The road will remain open and traffic will be maintained during construction operations. Drivers should expect delays and are encouraged to seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: October 2, 2026  – November 2026
Description: Asphalt preservation and resurfacing. The project is part of MCDR's 2026 Pavement Preservation Program (PPP).

🚧 27 Mile Road in Washington Township 🚧
Location: Between Van Dyke Avenue and Jewell Road
Traffic: The road will remain open and traffic will be maintained during construction operations. Drivers should expect delays and are encouraged to seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: October 5, 2026 – November 2026
Description: Asphalt preservation and resurfacing. The project is part of MCDR's 2026 Pavement Preservation Program (PPP).

🚧 Schoenherr Road in Utica and Shelby Township 🚧
Location: Between M-59 and 21 Mile Road
Traffic: The road will remain open with lane closures in place during construction operations. Drivers should expect delays and are encouraged to seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: October 5, 2026 – November 2026
Description: Concrete patching. The project is part of MCDR's 2026 Pavement Preservation Program (PPP).

🚧 Utica Road railroad crossing in Fraser 🚧
Location: Between Groesbeck Highway (M-97) and Masonic
Traffic: The railroad crossing is anticipated to be closed September 14 through September 20 for railroad repair work. Utica Road will be closed to through traffic at the railroad crossing. Drivers are encouraged to follow the posted detours and seek alternate routes. Access to all properties will be maintained throughout the duration of the project.
Duration: Work has been rescheduled until further notice. Work is anticipated to take place in 2026.
Description: The closure is associated with railroad crossing repair work by CN Railway.

🚧 Jefferson Avenue bridge over the Auvase Creek in Chesterfield Township 🚧
Location: Between 21 Mile Road and Cotton Road
Traffic: Jefferson Avenue will be closed to through traffic between  21 Mile Road and Cotton Road. Drivers are encouraged to seek alternate routes. Access to all businesses and properties will be maintained throughout the duration of the project.
Duration: Work has been rescheduled until further notice. Work is anticipated to take place in 2026.
Description: Bridge maintenance.

🚧 – Indicates new project or updated project information.

All dates are estimated and subject to change. Weather affects all work and may cause delays or cancellations.

2026 planned projects

MCDR has an extensive mix of work and road, bridge and traffic infrastructure improvements planned for 2026. Below is a list of anticipated projects.

Road Projects

ProjectLocationEstimated CostType of WorkCommunity
26 Mile Road and Hayes RoadIntersection$1,000,000ReconstructionMacomb Township, Ray Township, Shelby Township and Washington Township
32 Mile RoadCN Railroad Crossing to the County line$621,685Preventive maintenanceRichmond and Richmond Township
Broughton Road23-1/2 Mile Road to 24-1/2 Mile Road$7,000,000ReconstructionMacomb Township
Jefferson AvenueMetropolitan Parkway to South River Road$1,387,198RehabilitationHarrison Township
Little Mack AvenueTullio Street to South Nunneley Road, Carlier Street and South Nunneley$2,800,000ReconstructionClinton Township
North River RoadI-94 to Bridgeview Street$2,363,329RehabilitationHarrison Township
Powell Road30-1/2 Mile Road to 32 Mile Road$5,349,263ReconstructionWashington Township
Romeo Plank Road28 Mile Road to 29 Mile Road$629,328Preventive maintenanceRay Township
Sugarbush RoadCallens Road to Jefferson Avenue$1,241,136RehabilitationChesterfield Township
William P. Rosso HighwayI-94 to Jefferson Avenue$12,933,963ReconstructionChesterfield Township and Harrison Township
Salt River DriveLakeview Street to Meldrum StreetPavement Preservation Program (PPP)Asphalt overlayChesterfield Township
Sugarbush Road and Callens RoadPeltier Drain to Sass RoadPavement Preservation Program (PPP)Asphalt overlayChesterfield Township
Sugarbush RoadCotton Road to Rachid LanePavement Preservation Program (PPP)Asphalt overlayChesterfield Township
Cotton RoadGratiot Avenue to Halo DrivePavement Preservation Program (PPP)Asphalt overlayChesterfield Township
Clinton River RoadHayes Road to Garfield RoadPavement Preservation Program (PPP)Asphalt overlayClinton Township
Clinton River RoadGarfield Road to 17 Mile RoadPavement Preservation Program (PPP)Asphalt overlayClinton Township
21 Mile RoadGarfield Road to Romeo Plank RoadPavement Preservation Program (PPP)Asphalt overlayMacomb Township
Bordman RoadCryderman Road to Deland RoadPavement Preservation Program (PPP)Asphalt overlayRichmond Township
25 Mile RoadDequindre Road to Mound RoadPavement Preservation Program (PPP)Asphalt overlayShelby Township
Shelby RoadOlen Street to Utica city limitsPavement Preservation Program (PPP)Asphalt overlayShelby Township
Mound Road southbound rampsI-696Pavement Preservation Program (PPP)Asphalt overlayWarren
Dequindre Road13 Mile Road to 14 Mile RoadPavement Preservation Program (PPP)Asphalt overlayWarren
Dequindre RoadM-102 to Maplelane AvenuePavement Preservation Program (PPP)Asphalt overlayWarren
27 Mile RoadVan Dyke Avenue to Jewell RoadPavement Preservation Program (PPP)Asphalt overlayWashington Township
Jewell Road28 Mile Road to 29 Mile RoadPavement Preservation Program (PPP)Asphalt overlayWashington Township
Canal RoadHayes Road to Clinton River RoadPavement Preservation Program (PPP)Asphalt overlayClinton Township
Moravian DriveMetropolitan Parkway to Cass AvenuePavement Preservation Program (PPP)Asphalt overlayClinton Township
Romeo Plank RoadClinton River Road to Cass AvenuePavement Preservation Program (PPP)Asphalt overlayClinton Township
Mound RoadM-102 to I-696Pavement Preservation Program (PPP)Asphalt overlayWarren
Metropolitan ParkwayMound Road to M-53Pavement Preservation Program (PPP)Asphalt overlaySterling Heights
Aynesley Street17 Mile Road to south of Monticello DrivePavement Preservation Program (PPP)Concrete patchingClinton Township
Melody CourtAt Woodstream DrivePavement Preservation Program (PPP)Concrete patchingClinton Township
Rudgate WayLittle Mack Avenue to M-97Pavement Preservation Program (PPP)Concrete patchingClinton Township
Avery StreetCrocker Boulevard to South River RoadPavement Preservation Program (PPP)Concrete patchingMount Clemens and Clinton Township
Burgess DriveEntrancesPavement Preservation Program (PPP)Concrete patchingChesterfield Township
14 Mile RoadHayes Road to Utica RoadPavement Preservation Program (PPP)Concrete patchingFraser
Seaway CourtAt North Seaway CourtPavement Preservation Program (PPP)Concrete patchingHarrison Township
Susan Road21 Mile Road to Tilch RoadPavement Preservation Program (PPP)Concrete patchingMacomb Township
Valerie DriveHayes Road to Van Meter DrivePavement Preservation Program (PPP)Concrete patchingMacomb Township
10 Mile Road and Little Mack AvenueIntersectionPavement Preservation Program (PPP)Concrete patchingSt. Clair Shores
Ashbrooke DriveHawthorne Drive to Nickelby DrivePavement Preservation Program (PPP)Concrete patchingShelby Township
Hawthorne Drive and Ashbrooke DriveCreekside VillagePavement Preservation Program (PPP)Concrete patchingShelby Township
Scarboro WayKingscross Drive and Westcott CourtPavement Preservation Program (PPP)Concrete patchingShelby Township
Schoenherr RoadM-59 to 21 Mile RoadPavement Preservation Program (PPP)Concrete patchingUtica and Shelby Township
10 Mile RoadLorraine Avenue to Hoover RoadPavement Preservation Program (PPP)Concrete patchingWarren
Crack Sealing ProgramCountywide$500,000Pavement preservationMacomb County

Bridge and Culvert Projects

ProjectLocationEstimated CostType of WorkCommunity
21 Mile RoadOver the Salt Slang Gloede Drain$5,120,000Bridge replacementMacomb Township
Jefferson AvenueOver the Clinton River Spillway$862,000Preventive maintenanceHarrison Township
Romeo Plank RoadOver the Newland Drain$1,857,000Bridge replacementArmada Township
Schoenherr RoadOver the Red Run Drain$6,264,882Deck replacementSterling Heights

Subdivision Projects

ProjectLocationEstimated CostType of WorkCommunity
Annsbury DriveVan Dyke Avenue to Baypoint Drive$1,185,527Subdivision reconstructionShelby Township
Bittersweet Lane and Country Club DriveShelby Road to Sandy Creek Drive$655,051Subdivision reconstructionShelby Township
CedarviewChristopher Court, Saxon Drive and Brookhill Drive$1,297,805Subdivision reconstructionBruce Township
FieldcrestVincent Trail to East Nocturne Lane$776,032Subdivision reconstructionShelby Township
Nautical DriveLotties Drive to dead end$674,730Subdivision reconstructionChesterfield Township
Beaconsfield Street14 Mile Road to Gaynon Drive$190,000Subdivision preservationClinton Township
Bruce Hill Drive24 Mile Road to Chapman Road$135,360Subdivision preservationShelby Township
Glenwood StreetM-3 to Harper Avenue$487,000Subdivision preservationClinton Township
Grace StreetVan Dyke Avenue to Driftwood Drive$112,320Subdivision preservationShelby Township
Iroquois StreetM-3 to Radde Street$103,680Subdivision preservationClinton Township
Jerome StreetEdith Street to Helmandale Street$100,800Subdivision preservationChesterfield Township
Joel StreetEdith Street to Helmandale Street$95,040Subdivision preservationChesterfield Township
Laurel StreetM-3 to Hardy Street$123,840Subdivision preservationClinton Township
Little Mack Avenue14 Mile Road to McKishnie Street$159,000Subdivision preservationClinton Township
Mallast StreetJefferson Avenue to Wall Street$120,960Subdivision preservationHarrison Township
Monte RoadBelmont Boulevard to Monmouth Drive$51,840Subdivision preservationChesterfield Township
Penrod DriveGarfield Road to Kelly Road$305,000Subdivision preservationClinton Township
Ponchartrain StreetAcacia Street to Jefferson Avenue$106,560Subdivision preservationHarrison Township
Sherwood Lane24 Mile Road to 25 Mile Road$345,600Subdivision preservationShelby Township
Shoreline DriveSouth River Road to dead end$213,120Subdivision preservationHarrison Township

Non-Motorized Projects

ProjectLocationEstimated CostType of WorkCommunity
Bonior Trail Pathway ImprovementsNon-motorized pathway$2,103,726Non-motorizedClinton Township
Clinton River Spillway Trail (Shady Side Park) Pathway ImprovementsNon-motorized pathway$728,635Non-motorizedClinton Township
Jefferson Avenue PathwayNon-motorized pathway$919,700Non-motorizedChesterfield Township
Jefferson Avenue Spillway Pedestrian BridgeNon-motorized pathway$3,977,917Non-motorizedHarrison Township
25 Mile Road Pedestrian BridgeNon-motorized pathway$1,300,000Non-motorizedShelby Township

Anticipated projects are subject to change.