Gibson Drain

Pond Dredging Maintenance

Maintenance Project Phase I

An aerial satellite map of a suburban neighborhood, marked with a yellow dashed line that traces a path from the bottom-left corner (Avalon street), runs north-east past residential homes, and loops around a small retention pond near the center.

The Gibson Drain Maintenance Project – Phase I, located near 18 Mile and Dequindre Road in Sterling Heights, includes dredging of the westerly end of the pond, maintenance of the open channel through sediment and debris removal, and stabilization of the drain banks to improve overall system performance. The project goal is to restore hydraulic capacity, prevent further bank erosion, and reduce future maintenance needs.

Construction activities within the open channel began the week of April 6, 2026.

This $9000,000 project is funded by the cities of Sterling Heights and Troy.

  • The project includes the following:
    Dredging of the westerly pond area
    Open channel sediment and debris removal
    Bank stabilization and erosion control
    Installation of additional stone toe stabilization (27 feet)
    Site protection measures and restoration

Construction began in April 2026, with substantial completion anticipated by June 1, 2026.

 

Gibson Drain Maintenance Project Flyer