Clinton River Spillway

Stormwater Management

Highwater Grant Project

An aerial satellite map displays a suburban region centered around a major highway interchange, residential streets, and a prominent water channel highlighted by a thick, dashed line.

This $1.8 million grant-funded project is part of a broader climate resiliency initiative to improve the ecological and hydraulic performance of the Clinton River Spillway. The work focuses on stabilizing vulnerable streambanks, enhancing habitat, and reducing sediment transport along a critical section of the Spillway.

Improvements are designed to strengthen system resilience to high water events while supporting long-term environmental and stormwater management goals.

The project includes the following:

  • Installation of approximately 3,500 linear feet of coir logs for bank stabilization
  • Installation of 150 linear feet of rootwad revetment
  • Placement of 245 cubic yards of riprap
  • Construction of habitat pools (600 cubic yards of excavation)
  • Placement of native prairie seed mix over 1 acre
  • Planting of 120 native trees
  • Coordination with future pedestrian bridge improvements near Jefferson Avenue

These improvements will stabilize erosion-prone areas, enhance aquatic and terrestrial habitat, reduce sediment transport, and improve overall climate resilience.

Construction is anticipated to begin in July 2026 with completion in lake fall of 2026.

 

Clinton River Spillway Highwater Grant Project Flyer